Basic Info.
Lapping Form
Single Row Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Transport Package
in Bulk, in Bundle or as Customer Request
Product Description
Short Description:
Material: Q235 steel, Q345 steel
Place of origin: Tianjin China
Shipping Port: Tianjin Port
Certification: ISO9001, SGS etc.
Surface treatment: Galvanized, Painted
Sample: Available
Delivery time: 25-30 days after receive the deposit or L/C
Package: by bundle/in pallet for sea transportation
Side Triangle Bracket of Ringlock scaffolding is made of 48.3 mm with 3.2 mm wall thickness outside diameter galvanized tube.
They are used at the edge of a scaffolding to extend the reach or extension off of any side of the scaffolding,A platform can be laid on the side bracket in order to allow for construction processes closer to a building facade,the side bracket ringlock scaffold is usually with EN 12811,ANSI/SSFI SC100-5/05,AS/NZS 1576 and NCH2501 standards,the ringlock scaffolding triangle side bracket usually used in chemical industrial projects in many of the countries like Israel,Argentina,Los Angeles,America.
Address:
No. 9 Xiangfu Rd, Changsha, Hunan, China
Business Type:
Manufacturer/Factory
Business Range:
Agriculture & Food, Construction & Decoration, Manufacturing & Processing Machinery
Management System Certification:
ISO 9001
Company Introduction:
Hunan World Scaffolding Co., Ltd. is a subsidiary company of Shinestar Holdings Group, with design, production, sales, logistics into a whole as one of the leading engineering enterprises in China Project Materials. The company has independent R & D team, import and export rights, global sales network, can provide customers comprehensive scaffolding solutions. Products mainly include hot-DIP galvanized steel tube, galvanized metal plank, hot-DIP galvanized ringlock scaffolding, scaffolding coupers, frame system, steel props and so on, Product hot sales at home and abroad, is widely used in construction engineering facades, the building support, bridges, tunnels, chimneys, power plants, oil and petrochemical projects. In 2013, Shinestar Group entered into the construction scaffolding and galvanized metal plank industry, total factory located in Tianjin Daqiuzhuang Industrial Park, the factory has 10 production lines, processing lines, 4, 000 square meters of production workshop, 4, 000 square meters of warehousing and 10, 000 square meters yard, the annual output of 200, 000 tons, and have more than 10, 000 tons perennial spot. In future, of "high-quality products is a bridge to the world" for the purpose, we will continue to provide customers with "the best quality of products, the most comprehensive sales service, the lowest market price" to enhance customer market competitive advantages. "Customer-centric, continue to meet customer needs, improve customer satisfaction" will as the long-term development basic strategic.